And we don't think it is very attractive either.
Another point is that there isn't all that much space inside to be adding internal insulation. So we decided to insulate on the outside.
The final top coat is then applied - when you have a 6 hour minimum dry period expected. The pictures below show the almost finished product - still needs the window sills to be installed and the downpipe to be connected.
These walls are now a minimum of 50% better than Building Regulations or about U = 0.2.
What are your views on the blue? We like it.